Mack Land LLC - How Much Does it Cost to Remove a Swimming Pool

How Much Does it Cost to Remove a Swimming Pool

AVERAGE COST OF REMOVING A POOL WITH RESTORATION

 GOOD ACCESS (10’ WIDTH)LIMITED (6’ WIDTH)POOR ACCESS
Full Pool Removal$10 – 14K$12 – 16K$20K and up
Low Impact Pool Removal$7.5 – 10K$10 – 14K$15K and up
Basic Pool Removal$6.5 – 9K$7 – 12K$12K and up
Above Ground Pool Removal$1.5 – 3K$2 – 4K$4 – 6K

Note: Many other contractors do not properly restore the access path and pool area to a professional level. Don’t be fooled by lower prices that don’t include professional restoration.

COMPARING PRICES

Comparing apples to apples is just about impossible. In most cases we provide a scope of services that you would have to go multiple contractors to get the same scope of work completed. This is something anyone can do, but to do it correctly in a timely manner you need to have the right equipment and experience. Anyone can fill in hole, but the difference is the in the possibility of settling and impact/trauma to your property by the equipment being used. An excavation company may be cheaper, but they are not going to restore damage to your yard and will likely want to use over kill equipment causing unnecessary trauma to your property. Other landscape companies do not have the equipment or demolition knowledge to complete the project in safe timely manner without future issues.

COMMON QUESTIONS

Settling is the most common question asked. To date MackLand, LLC has never had an issue with settling on a pool removal. Why? Because we fill in thin even layers and compact it evenly as we fill the pool in.

How long will it take?

Most in ground pool removals are completed in 3-7 days. Above ground pool removals are completed in one to two days.

Who gets the permits?

MackLand, LLC will obtain all permit as part of our services.

How do we get started?

MackLand, LLC will start the permit process with a signed contract and a copy of your plat of survey.

What is PGE?

PGE is a regional classification of coarse gravel. PGE is 6-8” minus recycled fractured concrete gravel with fines suitable for use as sub base for roads or for general structural fill. MackLand, LLC will process all concrete
associated with the pool into PGE and use it as fill material.

What is better sod or seed?

Seed is by far the best way to go. Grass grown from seed will develop a more drought tolerant root system and blend into your existing lawn better. Also with sod it very possible to get grubs and other pests from the sod farm.

Sod vs Seed?

When do you need the project deposit?

MackLand, LLC prefers to pick up the deposit check in person after the permits are approved. Mack will deliver the permits and pick up the deposit check at that time. The remaining balance is due on completion.

Interested in any of our services?

Golden: 303.501-0828
Denver: 303.335-0850

Contact us today 

Recent Articles

Greenwood Village Pool Removal

In this Greenwood Village Pool Removal the customer had an unusual request.He wanted the concrete po…

Centennial Pool Removal

In this Centennial Pool Removal we were approached by a realtor who introduced us to the client. Thi…

Boulder Colorado Pool Removal

With this Boulder Colorado Pool Removal project a repeating theme occurred. The customer made the de…